✅ 96.7% reduction in time spent creating T&M Tickets (from 15 minutes to 30 seconds)
✅ $4M+ in T&M accurately tracked and billed on a single job, eliminating lost revenue
✅ 100% adoption rate in the field with zero pushback
Time-consuming, disconnected workflows for Change Orders and Time & Material (T&M) tickets have long been the norm in construction, and for years Castle Contracting’s project engineers faced the same burdens as their peers: chasing down handwritten tags, manually updating logs, and spending hours reconciling costs—often under tight deadlines and with limited visibility. These ingrained processes created friction in the field, slowed approvals, and left revenue exposed.
“I used to spend entire days just organizing Change Orders and manually recreating T&M Tickets,” says Alex Fesi, a senior project engineer supporting earthwork and site utility projects in St. Louis. “Now, what used to take hours takes minutes. Clearstory didn't just help us go digital — it freed up our time, protected our revenue, and made our clients happier.”
Before Clearstory, Castle’s Change Order process relied heavily on hand-written T&M Tickets filled out in the field, tossed in the backs of trucks, and often lost to time. On a single project, Alex Barger, who supports the renewable energy team at Castle, manually processed over 750 paper tickets in just six months, and still faced the same challenges as on other jobsites. “They’d get lost, they’d get forgotten, or worse — they’d turn up five months later after a job had already been closed out,” he explains. “That’s money left on the table.”
Both engineers point to the sheer risk of missed documentation. “If we didn’t capture every detail — who did the work, what equipment was used, what day it happened — we had no shot at billing it accurately,” says Barger. That meant hours of combing through paperwork, cross-referencing Excel logs, and chasing down field crews to reconstruct what happened days or weeks prior.
Fesi echoes that sentiment: “Sometimes I’d get a ticket five months after the fact — literally found behind a truck seat. By that point, it’s too late. You’re not getting paid for that work.”
Even when the tickets did make it in, the administrative burden was immense. Each ticket had to be manually organized, recreated in Excel, priced out, and matched to specific Change Orders. Then came the email chains with GCs and owners, each one requiring custom formatting or breakdowns by week, scope, or month. “It wasn’t just duplication of effort — it was multiplication,” said Barger. “And on one job with $4 million in T&M, that was two to three full days of my week.”
All of that changed with Clearstory. Purpose-built to help Specialty Contractors reduce risk and get paid faster on out-of-contract work, Clearstory’s core product is a shareable, cloud-based Change Order Log that creates instant alignment with GCs and features a tidy mobile app for digital T&M Tags, easy built-in Change Order templates, and instant pricing.