qce

How Quality Erectors & Construction Eliminated Manual Processes, Saving $100,000

Location (1) 1

Benicia, CA

type

Specialty Contractor

 Quality Erectors & Construction, Inc (QEC) adopted Clearstory as their Change Order Communication platform to document labor, material, equipment in the field and convert it to pricing the same day. The productivity savings they've realized are over $100,000 per year!

james-sullivan-ESZRBtkQ_f8-unsplash

We sat down with QEC’s Chief Executive Officer, Ethan Law, to discuss how Clearstory improved their Change Order process, captured lost revenue, and reduced administrative costs.

For over 35 years, QEC has serviced Northern California in the design, supply, and erection of pre-engineered metal buildings, metal roofing, architectural paneling, and structural steel. 


Results Using Clearstory

 

  • Saves 16 hours per week in improved productivity 

  • 85% faster change order processing 

  • Eliminated lost revenue from previous Change Order/T&M processes

 

The Challenge

 

QEC was using multiple project management programs and Excel to keep track of Change Order Requests, which created communication difficulties because cost information was not kept in one place. All cost information had to be entered and communicated manually, which resulted in lower than desired productivity. Additionally, Time and Material (T&M) Tags were often lost, sitting in a foreman’s truck, or rejected due to poor documentation, resulting in lost revenue.

 

 

Clearstory allows us to capture costs that we had previously lost out on. Now we capture those costs in a timely fashion that gives us unmatched professionalism in the construction industry."
ethan-2

Ethan Law

CEO, Quality Erectors & Construction, Inc.

 
Enter Clearstory

 

Implementing Clearstory on their projects resulted in immediate improvements for QEC, Inc. by eliminating lost revenue, increasing productivity, and decreasing processing time.

 

Eliminating Lost Revenue


One of the biggest impacts QEC realized was the ability to efficiently track and collect payment on cost impacts that were previously lost in the paper process. Clearstory allows them to instantly create and submit T&M Tags electronically with real time visibility back in the office eliminating the potential for lost or delayed revenue.

 

 

Improved Productivity and Reduced Administrative Costs

 

QEC also improved administrative productivity in their Change Order process by using Clearstory. Clearstory allows contractors to preload labor and equipment rates so CORs can be priced instantly. Now, when Change Orders are created, the costs are calculated and CORs are submitted in a few minutes vs the days (or weeks) it could previously take to process a paper tag. 

The cost savings are substantial as well. The average rate for his Project Managers is $125/hour, and he estimates that each PM saves 4 hours per week using Clearstory, totaling over $100,000 in savings annually. 

 

Faster Change Order Processing & Approvals


QEC has decreased change order processing by 85% with Clearstory's automated workflows. Several steps such as manually updating change order logs and transporting T&M tags have been eliminated completely with Clearstory and data is no longer manually transferred between the field and office.  The ability to share cost impacts for out of scope work on the same day work occurs in lieu of weeks later along with improved documentation quality have led to faster change order approvals for QEC. 

"We’re saving over $100,000 annually just in tracking our changes. On top of that, we’re also seeing the return on investment for actually tracking costs that we were previously losing in the paper shuffle."
ethan-2

Ethan Law

CEO, Quality Erectors & Construction, Inc.

$785M

in trade revenue protected

67,842

hours of project team    time savings

$1.2B

in Change Order Requests processed

Real-Time Visibility Across All Projects

Speed Up Change Order Review

Effortless COR and T&M Log Generation

e7d68701ac2b492acae16aae657d7a4c08c27aac
Mauris sit amet magna tiam eu turpis molestie sit amet feugiat lectu.
  • Curabitur tempor quis eros tempus lacinia.
  • Nam bibendum pellentesque quam a convallis.
  • Sed ut vulputate nisi. Integer in felis sed leo vestibulum venenatis.
  • Suspendisse quis arcu sem.
  • Morbi a eleifend magna. Nam metus lacus, porttitor eu mauris a, blandit ultrices nibh.
 
Mauris sit amet magna tiam eu turpis molestie sit amet feugiat lectu.
  • Curabitur tempor quis eros tempus lacinia.
  • Nam bibendum pellentesque quam a convallis.
  • Sed ut vulputate nisi. Integer in felis sed leo vestibulum venenatis.
  • Suspendisse quis arcu sem.
  • Morbi a eleifend magna. Nam metus lacus, porttitor eu mauris a, blandit ultrices nibh.

Want to see Clearstory in action?

Schedule a call with our team

Request a Demo
SVG-1
SVG-3
SVG-2
Social Icons
More Customer Stories

Raymond Group drastically reduces Change Order processing time with Clearstory

We sat down with Raymond Group's Vice President and Area Manager, Ray Gilbert, to hear how implementing Clearstory reduced the company's Change Order processing time and eliminated T&M Tag headaches.
Learn More

Shaw & Sons Concrete Contractors Streamlines Extra Work with Digital T&M Tags

The Clearstory team sat down with Olivia Russell at Shaw & Sons Concrete Contractors to discuss how our Clearstory helps her team. Read on to learn how using Clearstory resulted in a streamlined process and major time savings for Shaw & Sons.
Learn More

How Insulpro Decreased Change Order Processing Time by 75%

Before Clearstory, Insulpro’s Change Order process would typically take weeks - from the time extra work took place in the field to when a cost impact/Change Order was sent to the customer.
Learn More
Want to see Clearstory 
in action?

Contact us to schedule a 30 minute call to see if Clearstory is right 
for your team.

Request a Demo